Energy & Power Infrastructure

Power projects are governed by queues, outages, and equipment lead times — three constraints an owner can plan around but cannot compress.

Project types

Substations and switchyards

Transmission and distribution

Utility interconnection

Microgrids

Battery and long-duration storage

Solar and wind

Natural gas and distributed generation

Cogeneration

Grid controls and protection

Storm hardening and undergrounding

Power system commissioning

Where projects fail in this sector

These are the failure modes we see repeatedly. None of them are construction problems.

  • Interconnection queue timelines treated as schedule inputs rather than constraints

    A queue position is a constraint the project must be built around. Treated as an input, it silently absorbs every other float in the program.

  • Long-lead transformer and breaker procurement misaligned with construction

    Equipment that arrives after the pad is ready is a cost problem. Equipment ordered against a schedule that later moves is a much larger one.

  • Brownfield integration underestimated

    Tying into an energized facility is an outage-planning problem, a protection problem, and an operations problem before it is a construction problem.

  • Controls and protection commissioning compressed at the end

    The most technically demanding scope on the project routinely ends up with the least remaining schedule.

  • Permitting sequence not driving design

    Where the permitting pathway is not allowed to shape the design sequence, the design gets done twice.